The 155 Podcast Interview
Key Answers from The 155 Podcast
Two city-wide priorities, and how to achieve them
- Impose controls on hyperscale data centres: pause, publish studies and understand the long-term environmental and resident impacts before projects proceed.
- Restore financial credibility: he cites the missing financial statements since 2022 and credit-rating concerns, and wants basic financial controls and transparency.
Two changes to improve City services
- A single online portal (app) for service requests, payments and permits instead of siloed departments.
- Citywide LRT-disruption support, such as an alert system for detours and transit changes.
Two changes to improve quality of life in Hamilton
- Give environmental watchdog agencies “teeth” and better reporting so industrial polluters (e.g. black soot) face real consequences.
- Restore basic financial controls.
Two priorities for Ward 4
- Stop the proposed hyperscale data centre at the Stelco/Steel Port site outright, citing electricity use and the risk of warm-water discharge harming the bay and beach remediation.
- LRT mitigation: clear communication, timelines and access for businesses along the corridor.
Three words for a four-year term (looking back from September 2030)
An advocate, a listener, a rock.
Campaign Materials Archive
Help Us Archive the 2026 CampaignGot a flyer, mailer, or door hanger — at your door, in your mailbox, on a community board? Photograph it and email it to info@hamiltonvotes.ca. Seeing campaign ads online? Take a screenshot and send those too, with a note about where the ad appeared. Candidates and campaigns are welcome to send their materials directly to the same address.